1. Record measurements of the exposure chambers
2. Lay out required dimensions of the three tier rack design
3. Design metal patterns for punch and fold
4. Fabricate trays from 304 SS
5. Contact fabricators for quotes on door punching
6. Prepare drawings and prototypes for doors
7. Arrange for door fabrication
Saturday, September 20, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment